
"Council asked the study go ahead with a focus on using technology to minimize delays and evaluate CN and CP operating ..." (Young, 2020)
References:
Young, M. (2020, September 3). CN, CP say shared Saskatoon rail corridor to cut down on crossings not feasible: report. Retrieved from CTV News: https://saskatoon.ctvnews.ca/cn-cp-say-shared-saskatoon-rail-corridor-to-cut-down-on-crossings-not-feasible-report-1.5090569
Published on September 8, 2020