"Eight-lane tunnel to replace existing George Massey Tunnel by 2030: B.C. transportation ministry"

"The estimated cost of the project is $4.15 billion, with completion set for 2030 following five..." (Weisgarber, 2021)

Click here for full article

  

References:
Weisgarber, Maria. (2021, August 18th). Eight-lane tunnel to replace existing George Massey Tunnel by 2030: B.C. transportation ministry. Retrieved from CTV News: https://bc.ctvnews.ca/eight-lane-tunnel-to-replace-existing-george-massey-tunnel-by-2030-b-c-transportation-ministry-1.5551732 


Published on August 19, 2021