"First light-rail vehicle arrives at Metrolinx’s Finch West Maintenance and Storage Facility"

"The vehicle, which arrived in two pieces on July 28 and 29, is the first of two vehicles that will be delivered to..." (Metrolinx, 2021)

Click here for full article

  

References:
Metrolinx. (2021, August 3rd). First light-rail vehicle arrives at Metrolinx’s Finch West Maintenance and Storage Facility. Retrieved from MassTransit: https://www.masstransitmag.com/rail/vehicles/press-release/21232907/metrolinx-first-lightrail-vehicle-arrives-at-metrolinxs-finch-west-maintenance-and-storage-facility 


Published on August 5, 2021