"Alto, a Montreal-based Crown corporation chosen to build a proposed 1,000-kilometre, high-speed rail line through the Toronto-Quebec City corridor, is now considering an offshoot loop along its proposed Highway 7 route that could dip through lands just to the north of Belleville. The diversion could see the route split from Peterborough south-easterly down through Hastings County, onwards to Kingston then proceed to Ottawa..." (Derek Baldwin, 2026)
Click here for the full article
Baldwin, Derek. (2026, January 18th) High-speed rail project explores additional proposed route near Belleville. Available from The Belleville Intelligencer: https://www.intelligencer.ca/news/high-speed-rail-project-explores
Published on January 20, 2026
