"Strabag wins second phase tunnel work on Toronto’s Eglinton Crosstown extension"

"The project known as Advance Tunnel 2 will include design and build work on a 500m tunnel from east of Jane Street to..." (Menteth, 2024) 

  

Click here for the full article

Menteth Thames. (2024, Feb 22nd) Strabag wins second phase tunnel work on Toronto’s Eglinton Crosstown extension. Retrieved from Ground Engineering: https://www.geplus.co.uk/news/strabag-wins-second-tunnel-package-on-eglinton-crosstown-west-extension-22-02-2024/ 


Published on February 22, 2024